Infrastructure Committee

Key Achievements

Roads – Identified the road preservative treatment Reclamite, competitively evaluated cost and benefit and implemented the program in University Park for our two main roads. The treatment extends road life by 5 years and will save $300K from reserve costs.

Sewer system – First phase of our long-term sewage manhole repair program was implemented with the identification of an advanced technology repair technique, competitive evaluation of several vendors and successful repair of 23 severely deteriorated manholes on schedule and under budget.

– Evaluated the effects of the long-term lift station chemical Bioxide addition. Conducted extended tests and achieved a reduction in chemical usage of $10K annually.

– Lift station access and maintenance laydown space reviewed and access for the road upgraded on 4 stations in preparation for the start of the major wet well overhauls next year.

Gazebo & Observation Deck – Comprehensively inspected and identified a repair program to be implemented for the deck by December and a roof replacement for the gazebo in 2022.

Maintenance program – Completed, with PBM, the first phase of a program to create a comprehensive PBM maintenance management system for University Park.

Infrastructure Committee Members

Tom Christopher

Committee Chair

Werner Baumgartner

Committee Member

John Fricke

Committee Member

Tom Lordi

Committee Member

Chuck Marzullo

Committee Member

Bill Moore

Committee Member

James Pearson

Committee Member

Thomas Standridge

Committee Member

David Van Brunt

Committee Member

Committee Objectives

Water System

Conduct a thorough analysis of the potable water system, including the fire hydrants, and develop a detailed plan for the testing and repair of all necessary valves and piping. Commence phase 1 repairs in the first group of neighborhoods by year end.

Manholes

Oversee the technical requirements and procedures in support of PBM for the repair of 23 manholes which are categorized as the last of the most damaged manholes in the UP system.

Stormwater

Review operation of the stormwater drainage system and conduct the necessary inspections as required.

Infrastructure Summary

Develop a comprehensive summary of the infrastructure systems’ required yearly maintenance activities. Identify the recommended vendors, the specific type of maintenance and inspection and the frequency. Then following the review and approval cycle, purchase a maintenance software system that schedules, tracks and summarizes all critical maintenance and load the UP information.

Observation Platform

Complete the repair of the observation platform and replacement of the roof of the Gazebo.

Support

Provide the ongoing technical support for any maintenance or repair issues that PBM identifies associated with the infrastructure systems.

 

Meeting Minutes Archive

b

Infrastructure Committee Minutes 04.11.2024

PDF Document

b

Infrastructure Committee Minutes 03.14.2024

PDF Document

b

Infrastructure Committee Minutes 02.08.2024

PDF Document

b

Infrastructure Committee Minutes 01.11.2024

PDF Document

b

Infrastructure Committee Minutes 12.14.2023

PDF Document

b

Infrastructure Committee Minutes 11.13.2023

PDF Document

b

Infrastructure Committee Minutes 10.12.2023

PDF Document

b

Infrastructure Committee Minutes 09.14.2023

PDF Document

b

Infrastructure Committee Workshop Notes 08.10.2023

PDF Document

b

Infrastructure Committee Minutes 07.13.2023

PDF Document

b

Infrastructure Committee Minutes 06.16.2023

PDF Document

b

Infrastructure Committee Minutes 05.11.2023

PDF Document

b

Infrastructure Committee Minutes 02.09.2023

PDF Document

b

Infrastructure Committee Minutes 12.08.2022

PDF Document

b

Infrastructure Committee Minutes 11.10.2022

PDF Document

b

Infrastructure Committee Minutes 10.13.2022

PDF Document

b

Infrastructure Committee Minutes 08.11.2022

PDF Document

b

Infrastructure Committee Workshop Notes 07.14.2022

PDF Document

Our Roads

The roads in University Park will continue to be a priority for the Infrastructure Committee. Be sure and notify us or PBM should you observe anything requiring attention. 

university park florida

8301 The Park Boulevard
University Park, FL  34201

Get Directions

Office Hours

Monday - Friday:  9am - 4pm
Office closed weekends

Contact Us

941.355.3888
[email protected]